Good news for Shedd Acquarium lovers (via Urbanize Chicago):
The Chicago Plan Commission has approved the Lakefront Protection Ordinance application for renovations to the Shedd Aquarium. Located at 1200 S. DuSable Lake Shore Dr, the project will improve the facilities of the museum on the Museum Campus. Looking towards its 100th anniversary in 2030, the Shedd Aquarium plans the work as part of its Centennial Commitment, a $500 million plan to improve physical facilities and programmatic content.
The most prominent change to the exterior will be the addition of a new entry and ticketing pavilion surrounding the Man with Fish sculpture outside of the accessible entry. Currently the entry does not have enough capacity to meet demand, so the new design will accommodate a larger number of visitors. With 85% of tickets purchased in advance, the separated ticketing and entry pavilions will streamline the entry process for those who have bought tickets online allowing them to enter directly.
Two pavilions will be added in front of the current entrance with a circular trellis connecting the two to create a sense of arrival for visitors. The structures have been designed to create a light touch within the landscape, enhanced to allow for greater visibility of the entrances while using larger trees to break down the scale of the new structures. In response to feedback the ceilings of the pavilions will be GFRC instead of the original wood material.
No comments:
Post a Comment